# Capacity forecasting

Running out of capacity is a predictable incident, which makes it an
avoidable one. Forecasting converts a future outage into a scheduled
piece of work.

## Method

1. **Identify the binding constraint.** Which resource exhausts first,
   since forecasting the wrong one produces confident wrong plans (see
   capacity-planning).
2. **Project from real growth, not from targets.** Historical trend with
   its variance, because business plans are optimistic and capacity
   plans should not be.
3. **Plan to a threshold, not to the limit.** Trigger the increase at a
   utilisation level that leaves time to act.
4. **Include the lead time.** Procurement, provisioning, and migration
   take time that must be subtracted from the runway.
5. **Account for headroom for spikes.** Steady-state capacity that
   cannot absorb a peak is not adequate (see load-shedding).
6. **Model step changes separately.** A launch or a large customer moves
   demand discontinuously, and trend extrapolation misses it.
7. **Review the forecast against actuals.** A forecast never compared to
   what happened does not improve.

## Boundaries

Forecasts assume patterns continue and miss discontinuities. Elastic
infrastructure reduces but does not remove the problem, since quotas and
cost ceilings still bind. Over-provisioning is a real cost, so the
trade needs stating (see cloud-cost-optimization).