name: clarify-before-build
description: Question-led planning gate for implementation work. Use when the user wants a project plan, roadmap, feature plan, technical design, implementation plan, migration plan, product workflow, architecture change, or any substantial build before code changes begin. Forces the agent to repeatedly question assumptions, resolve ambiguity, identify risks and dependencies, and reach an explicit shared understanding before implementation starts. For small, low-ambiguity changes it runs a lightweight pass (assumptions stated, only blocking questions asked) instead of the full gate.
---

# Clarify Before Build

## Core Rule

Do not start implementation while material planning ambiguity remains. Keep questioning until the plan is specific enough that another capable engineer could execute it without guessing.

This skill is not for producing a quick plan and moving on. It is a planning gate: ask, refine, challenge, restate, and only then produce an implementation-ready plan.

## Right-Sizing the Gate

Match the gate's weight to the scope's risk, not to the request's phrasing.

Run the **full gate** (planning ledger, question rounds, Shared Understanding Contract) when any of these hold:

- multiple repos, services, schemas, or delivery slices
- schema/migration, auth/permission, payment, upload/parsing, background-job, or deployment changes
- multiple roles, tenants, or substantial user-facing workflows
- provider, library, or architecture selection with meaningful tradeoffs
- the user asked for a plan, roadmap, design, or architecture document

Run a **lightweight pass** when the scope is one repo, a few files, and none of the full-gate triggers apply:

1. Summarize the understanding in 2-3 bullets.
2. State assumptions inline and ask only blocking questions (0-2).
3. Proceed, and record the stated assumptions in the completion report instead of a contract.

If a lightweight pass uncovers a full-gate trigger, escalate to the full gate and say so. Never use the lightweight pass to dodge the contract on substantial work.

## Operating Mode

1. State that planning mode is active.
2. Summarize the current understanding in 3-6 bullets.
3. Identify unknowns, assumptions, contradictions, risks, and decisions.
4. Ask the next most important questions in a focused batch.
5. Wait for answers before finalizing the plan.
6. Repeat until no material ambiguity remains.
7. Produce a Shared Understanding Contract and ask for explicit confirmation.
8. Only after confirmation, offer implementation sequencing — and for substantial user-facing work, name `$user-action-coverage-review` as the first post-confirmation step.

Ask 3-7 questions per round when the problem is broad. Ask fewer questions when only one blocker remains. Do not bury the user in a giant questionnaire unless the scope is genuinely large.

If three question rounds pass without convergence, stop open-ended questioning. Present the remaining unknowns as a decision menu — each option with a recommended default and the risk of accepting it — and ask the user to pick.

## No User Available

This gate assumes an interactive user. When invoked headless — from an automation, another skill, or any context where nobody can answer — do not fabricate answers:

- Build the ledger anyway, marking open questions and assumptions `unvalidated`.
- Apply lowest-risk defaults only where a wrong default is cheap to reverse.
- Emit the Shared Understanding Contract labeled `DRAFT - not confirmed`.
- Do not start implementation from a draft contract. Surface the draft and stop.

## Related Skill Checks

Use related skills during planning when they apply:

- Use `$frontend-design-quality` when the plan touches frontend UI, portals, dashboards, forms, content pages, responsive layout, visual design, navigation, or user actions. Include its viewport, click-minimization, pattern reuse, visual verification, and Playwright expectations in the plan.
- Use `$security-threat-model` when the plan touches auth/authz, user data, tenant boundaries, payments, secrets, file upload/parsing, admin tools, deployment, CI/CD, external integrations, webhooks, background jobs, logs, or any security-sensitive path. Include threat boundaries, abuse paths, mitigations, and blocking findings in the plan.
- Use `$feature-design-preflight` when the plan touches nontrivial features or integrations where a naive implementation could pass the surface request but fail in real use, including uploads, media/video, PDFs/documents, file parsing, third-party APIs, long-running jobs, background work, data migrations, auth/permissions, payments, AI calls, storage, or admin/user portal workflows. Include requirement trace, constraints, provider/library fit, failure modes, and proof requirements in the plan.
- Use `$user-action-coverage-review` when the plan includes substantial user-facing work: routes, forms, mutations, saves/deletes, uploads, role-gated actions, or portal workflows. The confirmed plan must name it as the first post-confirmation step, and its action-matrix rows become acceptance-criteria evidence.

If any related skill applies, do not finish the Shared Understanding Contract until its relevant design requirements are represented in acceptance criteria, risks, and verification.

## Questioning Standard

Be direct and persistent. Question vague terms such as "simple", "robust", "admin", "portal", "done", "beautiful", "secure", "fast", "full coverage", "latest", "integration", "critical", "production-ready", "MVP", "AI-powered", "agentic", "smart", "automated", "real-time", and "scalable".

For each vague term, translate it into an observable requirement:

- user or role
- trigger or entry point
- exact behavior
- data involved
- success state
- failure state
- test evidence
- owner or decision maker

If the user answers partially, keep the answered parts and ask only about the remaining gaps.

## Planning Ledger

Maintain a visible planning ledger during the conversation:

- Confirmed decisions
- Open questions
- Assumptions
- Out of scope
- Risks and mitigations
- Acceptance criteria
- Test and verification requirements

Update the ledger after each answer round. Do not let stale assumptions survive silently.

For planning that runs long or spans sessions, write the ledger to a file (for example `docs/plans/<topic>-plan.md`) and update it in place after each round. The file, not chat history, is the source of truth, and the final contract is written to the same file. In plan modes that prohibit file writes, keep the ledger in-message and restate it in full after any context loss or summarization.

## Required Coverage

Before the plan can be called complete, cover:

1. Goal and non-goals
2. Users, roles, and permissions
3. Current state and constraints
4. Desired end state
5. User flows or system flows
6. Data model, persistence, integrations, and side effects
7. Edge cases and failure modes
8. Security, privacy, abuse, and operational risks
9. UX and frontend requirements when applicable
10. Test strategy: unit, integration, browser/E2E, visual, security, and local container validation
11. Rollout, migration, rollback, and observability
12. Dependencies, sequencing, and risks
13. Definition of done
14. Parallel work: independent lanes with disjoint ownership and expected evidence, or an explicit statement that parallel work does not apply

Read `references/question-bank.md` when the topic is broad, ambiguous, high-risk, or multi-role.

Read `references/shared-understanding-contract.md` before producing the final plan.

## Challenge Rules

Challenge the user when:

- a requested plan conflicts with repo constraints or AGENTS.md
- success criteria are not testable
- the plan skips security, data integrity, or rollback
- the plan touches UI but skips `$frontend-design-quality` considerations
- the plan touches sensitive systems but skips `$security-threat-model` considerations
- the plan touches a nontrivial feature but skips `$feature-design-preflight` requirement tracing
- the plan relies on GitHub/Vercel/CI to discover preventable failures
- the plan would create avoidable user friction
- the scope is too large to verify safely in one delivery stream
- the implementation path is chosen before the problem is understood

Challenge by explaining the concrete risk and asking for a decision. Do not patronize or lecture.

## Completion Blockers

Do not mark planning complete until all are true:

- Open questions are either answered or explicitly deferred.
- Assumptions are listed and accepted by the user.
- Acceptance criteria are observable and testable.
- Verification covers repo rules, local container gates, security review, secret scan, dependency audit, and frontend visual checks when applicable.
- Applicable feature, UI, security, and user-action coverage checks from `$feature-design-preflight`, `$frontend-design-quality`, `$security-threat-model`, and `$user-action-coverage-review` are included.
- The contract records a Parallel Work decision: lanes with disjoint ownership, or why parallel work does not apply.
- The plan separates must-have from later work.
- The user explicitly confirms the Shared Understanding Contract — or, in headless contexts, the contract is labeled `DRAFT - not confirmed` and implementation has not started.

If the user asks to skip planning and implement immediately, summarize the remaining ambiguity and ask for explicit approval to proceed with those risks. Do not silently skip the planning gate.

## Example Prompts

- "Use `$clarify-before-build` to plan the billing migration."
- "I want a roadmap for the new admin portal."
- "Help me design the upload pipeline before we build anything."
- "Plan this feature — do not write code yet."
- "Rename this config flag everywhere." (lightweight pass: state assumptions, ask at most the blocking question, proceed)