name: spec-to-work-items
description: Decompose a confirmed specification, implementation plan, or settled conversation into independently executable and verifiable vertical work items with dependencies, safe parallelism, conflict areas, tests, risks, and rollback notes. Use for delivery planning of a multi-behavior scope; default to a local Markdown plan and do not create external issues. Do not use for unresolved requirements, a single small fix, or a file-by-file technical-layer checklist. 将已确认规格、实施计划或已闭合对话拆成可独立执行和验证的垂直工作项，明确依赖、安全并行、冲突区域、测试、风险和回滚。用于包含多个可交付行为的交付规划；默认输出本地 Markdown 计划，不创建外部 Issue。需求未闭合、单个小修复或按文件与技术层罗列清单时不使用。
---

# Spec to Work Items（Spec to Work Items（规格拆分工作项））

Use the section matching the user's language. 使用与用户输入语言一致的章节。

# Spec to Work Items

Convert settled scope into delivery slices that can be executed and verified independently. Prefer observable behavior over technical layers.

## Boundary

- Require a confirmed specification, implementation plan, or sufficiently settled conversation. Route material open decisions to `requirements-clarification` or `requirements-to-spec`.
- Stay read-only. Return a Markdown work-item plan in the response. Save a file or create GitHub, Linear, or other external tasks only after explicit authorization and confirmed platform support.
- Do not substitute for the code-level atomic steps of `safe-change-plan`; this Skill owns delivery slicing, dependencies, and parallel coordination.
- Include migrations, compatibility, rollback, documentation, and tests within the behavior slice they support.

## Workflow

1. Establish the source specification, user-visible outcomes, acceptance criteria, exclusions, constraints, and unresolved assumptions.
2. Identify independently observable behaviors. Slice vertically so each item delivers one coherent outcome across the necessary layers.
3. For each item, define scope and out-of-scope boundaries, affected areas, acceptance criteria, the smallest credible verification, risks, rollback notes, and recommended Repo Doctor Skills.
4. Model prerequisites and blockers as a dependency graph. Name items that can run in parallel only when their dependencies, shared state, and integration sequence permit it.
5. Identify shared files, schemas, interfaces, fixtures, generated artifacts, and other conflict zones. Explain coordination when parallel items touch the same core area.
6. Keep tests close to each behavior. Do not defer all testing to a final item unless a genuinely cross-cutting verification cannot run earlier.
7. Validate the plan against the quality gates below; revise or reject it when a gate fails.
8. Return the ordered Markdown plan, parallel groups, integration checkpoints, and remaining planning unknowns.

## Quality Rejection Gates

Reject and explain a decomposition that:

- consists only of database, backend, frontend, documentation, or test layers;
- cannot verify an item independently;
- uses acceptance criteria such as only “development complete”;
- leaves dependencies unspecified;
- assigns broad edits to the same core files without declaring conflicts;
- postpones all tests to the end; or
- combines unrelated outcomes in one item.

## Completion Conditions

Complete only when every item has all required fields, dependencies are acyclic or explicitly blocked, parallel claims are justified, conflicts are visible, and every acceptance criterion is observable and verifiable.

# Output Contract

Start with source scope, dependency overview, parallel groups, conflict zones, and integration checkpoints. Then provide every work item with:

- `id`
- `title`
- `goal`
- `user_visible_outcome`
- `scope`
- `out_of_scope`
- `affected_areas`
- `dependencies`
- `parallelizable_with`
- `acceptance_criteria`
- `verification`
- `risks`
- `rollback_notes`
- `recommended_skills`
- `status`

End with rejected decomposition patterns, unresolved assumptions, and confirmation that no external issue or task was created.

---

# Spec to Work Items（规格拆分工作项）

把已闭合范围转成可独立执行和验证的交付切片，优先按可观察行为拆分，不按技术层机械切割。

## 职责边界

- 需要已确认规格、实施计划或足够闭合的对话；仍有关键决策时转给 `requirements-clarification` 或 `requirements-to-spec`。
- 保持只读，默认在响应中输出 Markdown 工作项计划。只有明确授权且平台确认支持时，才保存文件或创建 GitHub、Linear 等外部任务。
- 不替代 `safe-change-plan` 的代码级原子步骤；本 Skill 负责交付切片、依赖和并行协调。
- 迁移、兼容、回滚、文档和测试应进入其所支持的行为切片。

## 工作流程

1. 明确来源规格、用户可见结果、验收标准、排除项、约束和未解决假设。
2. 识别可独立观察的行为，按垂直切片拆分，使每项跨越必要技术层并交付一个完整结果。
3. 每项写明范围、范围外、影响区域、验收标准、最小可信验证、风险、回滚说明和推荐 Repo Doctor Skills。
4. 将前置条件和阻塞建成依赖图。只有依赖、共享状态和集成顺序允许时才声明可以并行。
5. 标识共享文件、Schema、接口、fixture、生成物等冲突区域；并行项触碰同一核心区域时说明协调方式。
6. 测试跟随对应行为，不得把所有测试推迟到最后；只有真正跨切片验证无法提前运行时才单列最终验证。
7. 使用下述质量门禁检查计划，不通过时修改或拒绝该拆分。
8. 输出有序 Markdown 计划、并行组、集成检查点和剩余规划未知项。

## 低质量拒绝门禁

出现以下情况应拒绝并解释：

- 只按数据库、后端、前端、文档或测试层拆分；
- 工作项无法独立验证；
- 验收标准只有“完成开发”；
- 缺少依赖关系；
- 多项大范围修改相同核心文件却未声明冲突；
- 所有测试都推迟到最后；
- 一个工作项混入多个无关目标。

## 完成条件

只有每项必需字段齐全、依赖无环或明确阻塞、并行声明有依据、冲突可见，且每条验收标准都可观察和验证时才完成。

# 输出契约

先给出来源范围、依赖概览、并行组、冲突区域和集成检查点。随后每个工作项必须包含：

- `id`
- `title`
- `goal`
- `user_visible_outcome`
- `scope`
- `out_of_scope`
- `affected_areas`
- `dependencies`
- `parallelizable_with`
- `acceptance_criteria`
- `verification`
- `risks`
- `rollback_notes`
- `recommended_skills`
- `status`

最后列出被拒绝的低质量拆分模式、未解决假设，并确认没有创建任何外部 Issue 或任务。